– Highway and Infrastructure Project The project included storm water network (300,400, 500), sewer network (200) & water network pipes (25,32,63,125,180).
a) Al-Shahd City 3, Nobles International Real Estate Development The project included water supply network (25,32,63,180,200,300), storm drainage, sewer network, electricity network, telecommunication network, CCTV and Roads network “12 – 14 meters wide”.
Project Manger
1/9/2022 – 1/6/2023
b) Jordan National Broadband Network in the Middle Region (NBN 3) Infrastructure Fiber Optics Cables
Head of Civil Engineering Department
6/8/2020 – 31/7/2022
c) Jallool 2 & 3 Highway and infrastructure Project. Highway length = 4km*10m width, works included water supply network (25,32,63,180,200,300), storm drainage, box culverts, street lighting, pump stations.
Project Manager
20/10/2018 – 10/2/2019
d) Reliability & Maintenance of bridges, culverts, storm water networks and highway from Na’ur – Al-Kharazeh – Al- Karak (130 km)
e) Arab Summit Project , included rehability of roads, construction of new roads, car parking, helipads, Police Officers booths.
f) Davos Summit Project, included roads maintenance, asphalt works and lineation, helipads, lineation.
g) Prince Hussein bin Abdullah Park (Sweameh Park) with an area of 250 donums to included roads, sidewalks, car parking (20,000 m2), pre-fab buildings, buildings,
3 septic tanks, landscaping, water and wastewater networks, 1,00 canopies, 3 large steel gates, boundary wall (galvanized mesh), external lighting, storm water drainage, box culverts, volley ball and football pitches.
h) Baptism Project, included helipad, Stone Gate, landscaping, roads expansion, sidewalks.
Infrastructure & Roads Site Engineer
20/9/2016 – 10/7/2018
– Rehabilitation of roads, infrastructure, water network, sewer network, storm drainage lines, and external walls in the Zarqa Free Zone.
-Project: Bus Rapid Transit (BRT) Between Amman & Zarqa Package (4) works included Transfer the water lines in order with the relevant authorities, water supply network (25,32,63,180,200,300), sewer network, storm drainage lines
-Several private villas in Amman, included Building work and Roads work.