(39 years and 2 months)
Certificates
Construction Railways Operations (CRO). QATAR 2018
• Construction Commissioning Railways Management (CCRM). QATAR 2019
• Aircraft line maintenance training in Queen Alia Airport ‘Royal Jordanian Airlines’. 2009
PMI Program Management Professional (PgMP) ® 2023 • PMI Risk Management Professional (PMI-RMP) ® 2023 • Project Management Professional (PMP)® 2023 • Primavera P6 Enterprise Project Portfolio Management (Primavera P6 EPPM). 2023 • UPDA/ MMUP (Urban Planning and Development Authority) from Ministry of Municipality and
Urban Planning. Qatar 2019 • University Qualification Equivalency from the Ministry of Education. UAE 2013 • CCE (Cost Certified Engineer). United Arab of Emirates 2014 • EX (Explosion) Awareness and Cables Glanding. (TCO) Kazakhstan 2022 • EHT (Electrical Heat Tracing) – Installation. (TCO) Kazakhstan 2022 • MCT (Multi Cables Transits) – Installation. (TCO) Kazakhstan 2022 • EPA 608 Universal (Environmental Protection Agency) USA 2023
Languages
Education
Professional Experience
Project name: Power Generation, Reception Area & Pressure Boost Facility (3GP-ME&I) Tengiz, Kazakhstan
https://www.chevron.com/projects/tengiz-expansion
Project value: One billion and five hundred million dollars
Job Responsibilities: • Work with the MC TCO (Mechanical Completion Tengiz Chevron Oil) Team to prepare and issue
the MC certificates and the weekly reports. • Worked with PPC (Project Production Control) to develop work schedules and daily production
plans that highlight construction status and root causes of non-completed works. • Provide daily reports of the Construction, MC progress to Management. • Facilitate the daily Red Zone and PLI (Punch list items) meetings to drive actions to closure
step in line with the MC (Mechanical Completion) Schedules. • Prepare the exception requests for the QVDs (Quality Verification Document) which are on
hold due to Constrained construction work. • Request the PTW (Permit to work) from PIC (Person in charge) and follow up regarding the
energized subsystems which required special approval procedures from (SC) System Completion. • Follow up with KPJV (Kazakh Projects Joint Venture) Engineering team regarding the RFI
(Request for information) response and RLMU (Red Line Mark UP) Drawing approval. • Participate in all the walkdowns for Fire and Gas Subsystems and take immediate action to
avoid A punches. • Verify and approve the new IWPs (Installation Work Package) which prepared by WFP (Work
Face Planning) team to cover the new DCN (Design Change Notice).
Job responsibilities: • Establish an office in Kazakhstan, develop Business relationships and General Management.
Project name: AL Saad Station • Responsible for coordinating and managing people, materials, subcontracts, schedules. • Responsible for Installing Under-Platform Supply (UPS) and Over-Track Extract (OTE). • Develop detailed station construction program in compliance with the overall Program. • Determine construction means and methods and the most cost-effective plans and schedules. • Responsible for the technical preparation, organization, implementation and administration of all.
works on site and all other necessary resources to keep the site functioning. • Ensure the Implementation of the Health, Safety and Quality Polices. • Responsible for work preparation, method statements, Inspection & Test plans and procurement of
materials and subcontract such that these are in place not to affect the progress of the Works • Ensure that Method Statements, Risk Assessments, ITP’s (Inspection Test Plan), lessons learned are
communicated to all relevant operatives. • Ensure that all construction activities in the Station, Tunnels and Cross Passages are carried out in
accordance with the approved Processes and Procedures. • Direct, coordinate and review the work plan for construction; meet with site engineers and other
site staff to identify and resolve problems, assign work activities. • Conduct a daily site inspection in order to oversee construction work as it is being completed;
verify that proper materials are used and that all other conditions are in conformance with contract
and specifications.
Project name: ADP (Abu Dhabi Plaza) Astana
Project value: 1 billion dollars
Job Responsibilities: • Maintain all BSs (Bid Summaries) and CSs (Compression Sheets) up to date in conjunction with
the latest drawings, MAR (Materials approval Request) & budgets. • Evaluate quotations through technical bid analysis for mechanical equipment’s. • Discuss with Client/Consultant and obtain their acceptance of alternative materials. • Ensure approval of manpower suppliers’ pre-qualification documents. • Assist planning engineers for updating the long lead items schedules. • Follow up with the commercial department for supplier payments. • Follow up with Accounts, Auditors, Stores, Logistics departments to reduce the time
consuming for suppliers’ payment process.
Job Responsibilities: • Prepare CS (Compression Sheet) and BS (Bid Summary) for all HVAC (Heating Ventilation Air
Conditioning) / Plumbing / Fire Fighting / LPG (Liquefied Petroleum Gas) Systems. • Prepare the preliminary Design (Single line Details drawing) for all the Mechanical systems. • Solve all the technical issues with the MEP (Mechanical Electrical Plumbing) Manager. • Constructed Project: Arabtec Head Office Dubai (Variable Refrigerant Flow – VRF Syst
Project name: Saadiyat Residences – Abu Dhabi
https://saadiyatbeachresidence.ae/;jsessionid=90A398FFBE0EA1F34ADF3C3FB8F6EA46?0
Project value: Seven hundred million Emeriti Dirham
Job Responsibilities: • Installation of mechanical works (HVAC, Plumping). • Supervision of the installation of firefighting and gas services. • Participation in MEP issues to minimize unexpected losses. • Modification of drawings to the As-Built stage. • Testing, Commissioning, and preparation of the O&M (Operation and Maintenance) manuals